Guided assembly / Stage 1 of 10
Loading recorder…
Power and midpoint
Prepare your bench
Power off before moving wires. Use synthetic signals with no person attached during instrument-connected tests.
Parts & insertion holes
| Board | Component | Holes | Orientation |
|---|
Make the connections
Work through the stage’s new wires with power off. Check terminal labels and hole coordinates at both ends.
Connection checklist
| Fitted | Wire / net | From | To | Instruction |
|---|
A tick records assembly only. Qualify each new module before powering it. Use the synthetic-input connections for signal tests.
Verify the stage
Acceptance targets
Project screening gates, not measured results or blanket component guarantees.
Troubleshooting
Keep a test record
Save the actual readings, instrument settings and evidence filenames. Results stay in this browser until you export them.