# Current implementation status — 28 September 2026

The six complete terminal/hole plans, selected modules, stage assignments and synthetic-input instructions are available in each design's docs/build-guide.html. There are no unnamed external wiring destinations in those plans. Module internal states require the documented continuity/voltage checks.

Fresh verification: all six KiCad ERC/DRC runs report zero violations/unconnected items; freshly exported schematic nets match specifications; all host suites pass (242 tests total). Improved breadboard checks find no conflicting or disconnected named nets, duplicate insertion holes or multiple connector-contact leads. Firmware image hashes match their manifests. No firmware changes or fresh cross-compilation were needed for these documentation/wiring refinements.

Manufacturer sources and scope are in manufacturer-evidence.md. Old contradictory pending-header guides were replaced or marked historical; prior versions are preserved in per-design history ZIPs. The stage dependency correction prevents IMU, SD and MyoWare wiring from being assigned before installation of those modules.

Physical tests remain unperformed: module configuration/supply, PCB power converters and USB layout, timing, analog noise/crosstalk, sustained SD/Wi-Fi operation, battery runtime and wearable safety. Online resources cannot certify the received hardware or replace those tests. No manufacturing or human-use approval is claimed. Bench/PCB differences are explicitly documented; no boards were ordered.
