# Current breadboard assembly

Start with [the complete build guide](build-guide.html), then [module qualification](module-qualification.md). The [stage acceptance guide](staged-build-guide.md) supplies instrument tests and limits. Use [synthetic input connections](synthetic-input-tests.md) before attaching MyoWare.

All six designs include auxiliary component and distribution boards. Every external endpoint has a terminal assignment; received-module continuity/configuration still requires checking. Original overview diagrams remain available but are not the current wire-by-wire instructions.
